Prepare before digging
Confirm the gate motor position, rack line, cable route and manufacturer clearances. Mark the opening and protect nearby paving.
Set and secure the base
Place the foundation at the intended finished height, check level in both directions and pour suitable rapid-setting concrete around it.
Mount and align the motor
Allow the concrete to reach the required strength, then attach the motor and use the available adjustment to align it with the rack.
Frequently asked questions
Can a homeowner install a gate motor base?
Yes, with careful preparation, suitable tools and the motor manufacturer’s instructions. SimpleBase removes the need to construct custom timber formwork.
Why does the foundation need to be level?
A level, stable base helps the gate motor engage correctly with the rack and makes final adjustment more predictable.
